Chamberlain LA412 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Sicherheit Chamberlain LA412 herunter. Chamberlain LA412 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
The Chamberlain Group, Inc.
845 Larch Avenue
Elmhurst, Illinois 60126-1196
www.liftmaster.com
12 VOLT DC SINGLE
SOLAR RESIDENTIAL GATE OPERATOR
Models LA412 and LA412-S
For Residential Use Only
Owner’s Manual
Please read this manual and the enclosed safety materials carefully!
Periodic checks of the operator by a qualified technician are required to ensure
safe operation.
The model number label is located inside the control box of your operator.
Serial #
Installation Date
Seitenansicht 0
1 2 3 4 5 6 ... 47 48

Inhaltsverzeichnis

Seite 1 - Owner’s Manual

The Chamberlain Group, Inc.845 Larch AvenueElmhurst, Illinois 60126-1196www.liftmaster.com12 VOLT DC SINGLE SOLAR RESIDENTIAL GATE OPERATORModels LA41

Seite 2 - INTRODUCTION

Check Your GateGate MUST be level.Gate and gate post MUST be plumb. Remove ANY/ALL wheels from the bottom of gate.Gate MUST NOT hit or drag across gro

Seite 3

Mounting OptionsMounting locations vary depending on the type and style of your gate.NOTES: • The top of the operator must be mounted at least 10 inc

Seite 4

1MANUAL RELEASEInsert the key into the lock and turn it 180° counterclockwise. Turn the release lever 180° counterclockwise. The operator is now in ma

Seite 5 - Injury or Death

3MEASURING AND MARKING FOR THE GATE BRACKETBefore proceeding, begin with the gate in the fully closed position. There are two methods for determining

Seite 6 - Hardware Inventory

4POSITION THE EXTENSION BRACKET TO POST BRACKETAssemble the post bracket by placing the extension bracket on top of post bracket. Insert the bolt thro

Seite 7 - Tools Needed

67POSITION GATE OPERATOR ON GATEThe post bracket assembly can be mounted several places on the gate post. Refer to page 11 for mounting options.Place

Seite 8 - Gate ravel

8TEST GATE TRAVELManually open and close the gate.Ensure that the operator does not bind against the pull-to-open bracket.Ensure that the piston does

Seite 9

9SECURE POST BRACKET TO GATE POSTMark holes for the post bracket. Remove the clamp and the operator, and set both aside. Next, drill adequate holes in

Seite 10 - Check Your Gate

To prevent SERIOUS INJURY or DEATH from a moving gate:• Install warning signs on the front and back of the gatein PLAIN VIEW.• Permanently secure ea

Seite 11 - Mounting Options

13MOUNT THE CONTROL BOXThe control box MUST be mounted within 5' of the gate operator. Mount the control box as high as possible for best radio r

Seite 12 - INSTALLATION

TABLE OF CONTENTS2-7 INTRODUCTION2 Safety Symbol and Signal Word Review3 Operator Specifi cations4-5 Safety Installation Information6 Carton Invent

Seite 13 - RIGHT SIDE BRACKET MOUNTING

MOUNT THE CONTROL BOX (CONTINUED)Secure the control box to mounting surface (post, wall, column, etc.) using the appropriate hardware (not provided).1

Seite 14 - RIGHT-HAND GATE

FUSEOPENMoving Gate Can CauseInjury or DeathKEEP CLEAR! Gate may move at anytime without prior warning.Do not let children operate the gate orplay in

Seite 15 - Lock Washer

3CONNECT THE OPERATOR TO THE CONTROL BOARDExtend the operator cable and wires to the Gate 1 connector and connect as shown. Tighten watertight connect

Seite 16 - 1/2" (1.3 cm)

Connect the Gate Operator (Gate 2) to the Control Box (Model LA412-S Only)Occasionally in dual gate installations, one gate will need to open fi rst an

Seite 17

5CONNECT SECOND OPERATOR TO CONTROL BOARD(MODEL LA412-S ONLY)• Before digging, contact local underground utility locating companies.• Trench across

Seite 18 - Gate Travel

6JUNCTION BOXThe following items are required to complete the junction box installation:• 4 x 4 Junction Box with 3/4" NPT threaded port holes• S

Seite 19

7CONNECT WATERTIGHT CONNECTORSRoute operator cable and extension cable through watertight connector nut and watertight connector. Insert cables and wa

Seite 20

SOLAR PANEL INSTALLATIONSelect Site for Solar Panel(s)The solar panel(s) must be located in an open area clear of obstructions and shading for the ent

Seite 21 - Control Box

1OVERVIEW OF SOLAR PANEL INSTALLATIONMake sure the control box has two 12V 7AH batteries installed. Do not connect batteries until instructed.Solar Pa

Seite 22 - ACCESSORY

2POSITION SOLAR PANEL(S)NOTE: If the panel(s) is not casting a shadow, the battery is not being charged.The location of the panel(s) is critical to th

Seite 23

Operator Dimensions and SpecificationsMain Supply 12VDC Battery run. Operational between 11.5VDC and 14.5VDC.Accessory Power 12V nominal Class II ba

Seite 24

3POSITION SOLAR BRACKETPosition solar bracket on mounting surface. Mark and drill holes.NOTE: Solar panel(s) MUST be installed facing south. Use a com

Seite 25 - Within 5’

7CONNECT SOLAR PANEL(S) TO OPERATOR CONTROL BOXOpen the control box cover. Disconnect all power and batteries from the control board. Run the solar pa

Seite 26

8CONNECT BATTERIESThe batteries are charged in circuit by using the solar panel (provided).Locate the two white battery plugs on the left-hand side of

Seite 27 - SOLAR PANEL INSTALLATION

PROGRAMMINGProgram LimitsThe limits are internal settings that indicate when the gates are in the fully open position and the fully closed position. F

Seite 28 - Solar Panel Installation 28

NOTES:• The gate with the longer travel span (opening) must be set as the primary gate (GATE 1).• If one gate is overlapping the other, the gate t

Seite 29 - Solar Panel

Force and Timer to CloseFORCE ADJUSTMENTThe operator is equipped a with an obstruction sensing feature. If the gate encounters an obstruction the oper

Seite 30

Z22 R91 CLOSE EDGE R94 R92 R93 L1 R1 R2 Z1 K5 K6 K2 F3 10A 32V D1Ø OPEN EDGE/ PHO T O OPEN PHO T O CLOSE PHO T O R227 R2Ø7 Z2 Ø R223 P1 Z9 Z8 F2 F6 D4

Seite 31 - Control Board

OPERATION AND MAINTENANCE 1. READ AND FOLLOW ALL INSTRUCTIONS. 2. NEVER let children operate or play with gate controls. Keep the remote control a

Seite 32 - Battery Connectors

MANUAL RELEASEIn case of a power failure, the operator can be disengaged from the gate. With an operator, the release action may sometimes feel stiff/

Seite 33 - PROGRAMMING

EDGEEDGE50-220 SAFETY SENSORS50-220 SAFETY SENSORSOROPEN (EXIT LOOP )SINGLE BUTTON (SBC)RESETSTOPSHADOW LOOPINTERRUPT LOOP50-220 SAFETY SENSORSCLOSEED

Seite 34 - PROGRAM CLOSE

1. READ and FOLLOW all instructions. 2. The gate operator is intended for use with Class I vehicular swing gates. Class I denotes a vehicular gat

Seite 35 - Force and Timer to Close

Your gate operator is programmed with self-diagnostic capabilities. The diagnostic LED will fl ash a number of times then pause signifying it has found

Seite 36 - To Erase All Codes

SYMPTOM POSSIBLE SOLUTIONOperator does not run. • Power not connected. Make sure the AC/Solar input is connected and that at least Diagnostic LED no

Seite 37 - IMPORTANT SAFETY INSTRUCTIONS

SYMPTOM POSSIBLE SOLUTIONThe arm moves but cannot • Arm does not extend or contract enough during travel. The arm piston must extendexit Learn Limits

Seite 38 - MAINTENANCE

43 Operation and MaintenanceSYMPTOM POSSIBLE SOLUTIONGate opens but does not • An open input is continuously activated. Check the open loop or ve

Seite 39 - Wiring Diagram

3542167REPAIR PARTSControl BoxITEM PART # DESCRIPTION QTY 1 K1A6426-1 Control Board withMounting Bracket 1 2 K23-19380 Reset Switch 1 3 K74-

Seite 40 - Diagnostic Chart

ACCESSORIES3-Button SECURITY✚® Remote Control:Includes visor clip.Protector System® Safety Sensors:The Safety Sensors are recommendedfor installation

Seite 41 - Troubleshooting

WARRANTY POLICYLIFTMASTER ONE YEAR LIMITED WARRANTYThe Chamberlain Group, Inc. warrants to the first retail purchaser of this product, for the structu

Seite 43

© 2008, The Chamberlain Group, Inc.01-34491B All Rights ReservedTEMPLATE FOR POST BRACKET MOUNTING7 6 5 4 3 2 17 6 5 4 3 2 1

Seite 44 - REPAIR PARTS

13. Each gate operator is provided with two safety warning placards. The placards are to be installed on the front and back of the gate where they a

Seite 45 - ACCESSORIES

Carton InventoryThis operator comes with the hardware to install on a gate that pulls-to-open. If your application requires the gate to be pushed open

Seite 46 - WARRANTY POLICY

Additional Items For PurchaseThe following items are REQUIRED to completethe installation: SAFETY SENSORSThe Model 50-220 safety sensors are intended

Seite 47

Moving Gate Can CauseInjury or DeathKEEP CLEAR! Gate may move at anytime without prior warning.Do not let children operate the gate orplay in the gate

Seite 48 - 7 6 5 4 3 2 1

Outside PropertyInside PropertyMoving Gate Can CauseInjury or DeathKEEP CLEAR! Gate may move at anytime without prior warning.Do not let children oper

Verwandte Modelle: LA412-S

Kommentare zu diesen Handbüchern

Keine Kommentare